STELTECH
Health and Safety
Take 2
Safe Observation
Crane Inspections
Daily Mono Rail Crane Checks
Daily Crane 1 Checks
Daily Crane 2 Checks
Daily Crane 3 Checks
Daily Crane 4 Checks
Daily Crane 5 Checks
Weekly Mono Rail Crane Checks
Weekly Crane 1 Checks
Weekly Crane 2 Checks
Weekly Crane 3 Checks
Weekly Crane 4 Checks
Weekly Crane 5 Checks
Pre-Start Checks
Heavy Splice Pre-Start
Flange Line Pre-Start
Web Line Pre-Start
Trestles Pre-Start
Climax Welding Pre- Start
Corimpex Welding Pre-Start
Squirty Welding Pre-Start
Finishing Pre-Start
Quality
Event reporting
Crane Inspections
>
Weekly Crane 1 Checks
>
Weekly Crane 1 Checks
Crane 1
| Date of Inspection |
| Inspection Completed by - Full Name |
Inspections Completed
| I have checked all limits & directions the crane can travel function correctly |
| I have checked the rope & hooks for damage & spooling problems by running the hook to the ground and back to the top |
| I have checked the operation of the horn and safety stop with the crane hook loaded and lowering |
| I have completed a Visual inspection of the Crane body and can see no loose objects, oil leaks or loose panels |
| I have checked the crane rails appear free of rubbish and obstructions |
| I have checked the crane long travel catenary cables laying correctly |
| I have checked the long travel motion stops without crabbing occurring |
| I have checked the chains, pins and attachments for damage |
Crane in Safe Condition
| I confirm the crane passed all weekly checks and is safe to operate OR |
| I have applied a warning card to the crane remote and notified my supervisor of the issue I found |
| Description of issue identified |